Data · City of Calgary open data

Calgary electrical work, by the numbers

Every electrical permit the City of Calgary has issued since 2018-05, counted by year, type, quadrant and community, with the share of inspections that fail. Aggregates only: no addresses, no names, no contractor rankings.

Queried 2026-09-25Latest permit 2026-09-23Licence OGL – City of Calgary

35,704electrical permits issued by the City of Calgary in 2025, up from 19,828 in 20191
238,245electrical permits in the City’s open dataset since the series began in 2018-051
12,710solar PV permits in 2023–2025; 62.8% were on existing buildings1
15.6%of 2025 electrical inspections with a pass/fail result were marked “Not Acceptable”1
Permits by year

The city’s electrical workload has nearly doubled

Electrical permits issued per calendar year. Solar photovoltaic systems have their own permit type, so the copper segment is an exact count, not an estimate.1

Contractor permits: new construction and alterationsHomeowner permitsSolar PV permits* 2026 to 2026-09-23† 2018 series starts in May

A permit is not a job: one permit can cover a whole new building, and an annual facility permit covers many jobs at one site. One row per inspection. Permits are counted once however many inspections they had.

Solar

Solar PV permits peaked at 4,905 in 2024

Most Calgary solar permits are retrofits on existing buildings rather than panels built into new homes.1

Existing buildingsNew construction
Inspections

15.6% of inspections failed in 2025

Share of electrical inspections with a pass or fail result that the City marked “Not Acceptable”, meaning the work had to be corrected and re-inspected. The rate was 13.4% in 2023.1

202313.4%
202413.7%
202515.6%
2026 (to date)13.7%

Inspection rows by year of completeddate. notAcceptableShare = Not Acceptable / (Acceptable + Acceptable - Close Permit + Not Acceptable). Cancelled, Not Required, VOC and blank outcomes are excluded from the share; the dataset does not define VOC. “VOC” results are not defined by the City and are left out. Read how electrical permits and inspections work.

Quadrants

Where the permits are

Electrical permits issued 2023–2025 by the quadrant in the street address. Where the permit address matches the City’s assessment roll, 90% were at residential properties.1

NW Calgary29,353
SE Calgary28,039
SW Calgary27,680
NE Calgary17,966
Communities

The 25 busiest communities, 2023–2025

Distinct electrical permits by community. About a quarter of permits carry no community on the permit record; we fill those from the City’s assessment roll by address. The last column shows each community’s rank without that fill.1

Electrical permits by community, 2023–2025
RankCommunityPermitsNew constructionSolar PVRank, record only
1MahoganySoutheast2,6671,0077202
2CornerstoneNortheast2,3501,0452891
3LivingstonNorth1,6808681443
4SetonSoutheast1,6599152995
5Saddle RidgeNortheast1,434748767
6CarringtonNorth1,3535813064
7Sage HillNorth1,34685511812
8LegacySouth1,2513872356
9CranstonSoutheast1,2432522208
10TuscanyNorthwest1,22825332510
11BelmontSouth1,18680612020
12EvanstonNorth1,1773162049
13RangeviewSoutheast1,11073415011
14BownessNorthwest9915096535
15Glacier RidgeNorth96442125013
16Pine CreekSouth9555754016
17Auburn BaySoutheast93320120414
18Lake BonavistaSouth92010214015
19West SpringsWest91634514125
20HaskayneNorthwest8854588122
21Downtown Commercial CoreCentre85738063
22Douglasdale/GlenSoutheast85417216828
23McKenzie TowneSoutheast85315112519
24RedstoneNortheast8525033330
25EvergreenSouth84315716217

Homeowners pulled 5,834 of the 103,067 permits in 2023–2025 (5.7%); the rest were contractor permits. New suburbs lead because every new home needs its own wiring permit.

Method

How these numbers are counted

Categories are the City’s own permit types, so they are mutually exclusive and cover every permit. The script that produces this page re-runs the same queries against the City’s API.

Permit categories, 2023–2025
CategoryPermitsRule in the City’s data
Solar photovoltaic system12,710permittypecode = 'PhotoCon' (Contractor's Photovoltaic System Permit)
Fire alarm system1,212permittypecode = 'FireCon' (Contractor's Fire Alarm Permit)
Communications cabling47permittypecode = 'CommCon' (Contractor's Communications Permit)
Sign installation4permittypecode = 'SignCon' (Contractor's Sign Installation Permit)
Annual facility permit (ongoing maintenance/alterations at one facility)687permittypecode = 'AnnuEPCon' (Contractor's Annual Electrical Permit)
Homeowner (owner-performed) electrical work5,834permittypecode = 'EPHome' (Homeowner's Electrical Permit)
Contractor wiring in new construction35,454permittypecode = 'EPCon' AND workclassgroup = 'New'
Contractor alterations, additions and renovations to existing buildings47,119permittypecode = 'EPCon' AND workclassgroup IN ('Improvement', 'Home Occupation')
  • Calendar year of issueddate. Permits with no issueddate are excluded from yearly counts.
  • The street-address quadrant suffix (NW, NE, SW, SE) on the permit address. Addresses with no suffix are "unassigned".
  • The open data does not identify EV chargers, service upgrades or panel changes, and carries no job values, so this page does not estimate them.
  • Contains information licensed under the Open Government Licence – City of Calgary.

Sources

  1. Electrical Permits and Inspections (dataset vxgy-id5s)The City of Calgary, Open Government Licence – City of Calgary · queried 2026-09-25